McQuay M5LCX Especificações Página 38

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 51
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 37
36
Electrical
Service Parts Maintenance Procedures Period
1.Check voltage, current and wiring.
2.Check faulty contacts caused by loose connections,
foreign matters, etc.
Every 2 months
Every 2 months
1.No maintenance needed if refrigerant circuit
remains sealed. However, check for refrigerant leak
at joints and fittings.
No maintenance
required.
Every 6 months.Compressor
1.Oil is factory charged. Not necessary to add oil if
circuit remains sealed.
Compressor
Lubrication
Fan Motors
Lubrication
1.All motors pre-lubricated and sealed at factory. No maintenance
required.
Vista de página 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 50 51

Comentários a estes Manuais

Sem comentários